Calls to beautify pipeline

The Palmer section of the Mannum to Adelaide pipeline was painted back in 2022 and has inspired Mannum locals to think of creative ways to beautify their section of the pipeline. (Krystal Hender: 439639_01)

Mannum locals have jumped on Facebook to make suggestions on ways to beautify the Mannum to Adelaide pipeline. A post […]

Subscribe or Login to see the rest of the content.